top of page
Meeting, architecture and hands of people with blueprint, collaboration and strategy for c

 Permitting Support 

Permit Drawings for Utilities  |  Permitting for Mining & Landfill

BAIR GOODIE supports right-of-way agents and permitting companies working on behalf of clients in such fields as telecommunications & broadband and electric/gas transmission & distribution, by creating drawings and exhibits needed to support various permit applications. BAIR GOODIE also provides permitting services for the mining and landfill markets, as well as environmental permitting to support all of the above. We cover new well pad exhibits for oil and gas, easement exhibits for easement acquisition along new transmission line corridors, or landfill PTI for a future expansion, and much much more.

Telecom/Broadband Permit Support

chaos of fiber optic and telephone cables on electric pole.jpg

Bair Goodie's licensed professional surveyors and professional engineers support permitting teams who require certified drawings and plans in order to obtain speedy permit approvals in a variety of states and jurisdictions.

​

Drive Permits & Traffic Control Plans

bga-tce-drawing.jpg

Bair Goodie creates permit drawings for new drive and access road entrances that serve landowners or as temporary or permanent construction entrances. Our traffic engineers also create traffic control plans and design site specific work zone traffic controls for distinct needs and locations.

Electric & Pipeline Exhibit Drawings

bga-pnp-drawing.jpg

Bair, Goodie and Associates, Inc. leverages decades of experience creating a wide range of PLS and PE permit drawings and exhibits for electric and pipeline transmission or distribution lines, as well as aerial or buried telecom or broadband lines.​

Mining Permitting & Support

Bulldozer

Bair Goodie has vast experience in coal mining permit preparation, mining plans, inventory and reserve reports, pond design, diversion design, stream reconstruction plans, haul road design, preparation of reclamation plans, and many other mining related services.

Environmental Permitting

Ecological Studies Services.JPG

Jurisdictional Determination Request, National Historic Preservation Act Coordination, Endangered Species Act Coordination, Clean Water Act Permitting, Rivers and Harbors Act Permitting, as well as other compliance support.

​

Landfill Permit To Install (PTI)

Airspace Topo.png

Our experienced engineers have decades worth of experience creating and obtaining solid waste landfill permits-to-install (PTI), which is required before a solid waste facility can be constructed or expanded. We also provide necessary support to others working through this detailed process.

Electric / Telecom Permitting Support
3rd Party Pole Attachments

Detailed Pole Analysis
Conservation Authority & Waterway
Highway and Transportation Authority Crossings
Bridge Crossings
Section 10 Stream Crossings
Rail Crossings
Third Party / Joint Use Attachment
Easement Exhibit Drawings
Data Collection / Verification
Digital Twin powered by Mobile LiDAR
Cloud 3D LiDAR View
Asset Condition Assessment

 

Mining Pre-Permitting Services
Preparation of all ODNR Paperwork for Drilling
Supervise Test Drilling
Evaluate Drilling and Report Tonnages, Strip Ratios, and Coal Quality with Recommendation on Leasing

​

Mining Permitting Services
Jurisdictional Determination (JD) Investigations
Stream and Wetland Delineations
Prepare Preliminary Surface Mine Permit Layout and Mine Plan
Prepare Permit Application to be submitted to ODNR, Division of Mineral Resources Management
OEPA Permit Application
All Necessary Permits for Pond Design, Geology, Hydrology, Road Barriers, and Land Uses
Inspect Construction as Needed
Certify Structures (Haul Roads, Ponds, Hollow Fills, Diversions, etc.)
Solicit Proposals for Cultural and Archaeological Surveys
OEPA / NPDES
Section 401 and Section 404 Permits
MSHA Pond Design and Reporting

Mining Permit Maintenance through Permit Life​​​

Oil & Gas Well Site & Pipelines Permitting
Lease Exhibit Drawings for Surface Owner Coordination

Easement Exhibit Drawings for Acquisition
E&S Plan Design and Reports
NPDES Permits and Monitoring
Sewage Permits
Recon Visits for Preliminary Site Selections
Geotechnical/Slope Stability Analysis and Recommendations
Construction Observation During Pad and Pond Construction
Permitting and Coordinating Issues Addressed by Regulators
Permit Fee Management

​

Environmental Permitting
Joint Application for PA Water Obstruction and Encroachment Permits
PADEP General Permits
NYDEC Permits
Erosion and Sedimentation Control General Permits (ESCGP-2) to include PCSM and SR Plan Preparation
Well Drilling Permits
Chapter 105.12 Waiver Requests
USACOE Individual and General Permits
NPDES Permits
PNDI Correspondence
PHMC Correspondence
(PennDOT) Highway Occupancy Permits (HOPs)
Permit Transfers

​

Mining Permit Maintenance
Prepare and Submit Necessary Paperwork

throughout Life of Permit
Annual Map and Report
Bond Release Requests
Monthly Pond and Quarterly Surface Water Monitoring (Sampling and Reporting)
Permit Revision Applications
Incidental Boundary Revisions
Soil Sampling, Completion of Planting Reports, and Yield Data Information
Pre-Blast Surveys

​

© 2023 by Bair, Goodie and Associates, Inc. All rights reserved.

  • Facebook
  • LinkedIn
bottom of page